Examples of the culvert and grip interventions that have been implemented in the Stroud Frome Catchment to reduce surface runoff and material transportation from tracks: (a) large culvert pipe and stone soakaway in a catch pit under the inlet pipe, (b) a track side storage area, and (c) grip created alongside tracks [Colour figure can be viewed at wileyonlinelibrary.com]
segunda-feira, 31 de dezembro de 2018
domingo, 30 de dezembro de 2018
sábado, 29 de dezembro de 2018
sexta-feira, 28 de dezembro de 2018
Assinar:
Postagens (Atom)